INSTRUCTION MANUAL MM-611 CCModel FS8-WG-SLFlow SwitchC
PTFEPTFE
4STEP 5 - Making Electrical Connectionsa. Apply pipe sealing compound or PTFE tapeto the threads (U) of a 1/2 ” (15mm) NPT pipe.Ub. Insert the three (
5STEP 5 - continuede. Verify that the paddle’s full range of motion(AA) is unobstructed. Some system piping disassembly may be required.AA• To prevent
h. Connect the red flow switch wire (HH) to the“Hot” power supply wire (JJ). Cap with a wirenut and seal with electrical tape.HHredJJ“Hot”i. Cover and
OFFONa. Disconnect the electrical power to the flow switch.STEP 7 - Adjusting the Flow Rate (only necessary if operationabove minimum flow velocities
Xylem Inc. 8200 N. Austin Avenue Morton Grove, Illinois 60053 Phone: (847) 966-3700 Fax: (847) 965-8379www.xyleminc.com/brands/mcdonnellmillerMcDonnel
Commentaires sur ces manuels